Río Manso Transfer
The Manso Project is located in Caldas, in the limits of the municipalities of Samaná and Norcasia, on the eastern slopes of the
View more
|
|
|
|
Tunjuelo Bajo Interceptor
Located in Kennedy, Bosa and the Municipality of Soacha, it will drain an area of 24.710 acres and will benefit a population of 3 million inhabitants. It will have and approximate length of 8 kilometers with a diameter of 8.86 ft. More than 706.293 ft³ of cement, 3.000 tons of reinforcement...
|
|
View more
|
|
|
|
La Banqueta Load-Transfer Dock
Conconcreto S.A. built the first stage of the Banqueta Load-Transfer Dock in the Meta river, in Puerto López, Meta.
This dock is located on the right side of the Meta river, about 23 kilometers from the urban area in Puerto López. The project includes the construction of different modules: warehou...
|
|
View more
|
|
|
|
|
|
Bonyic Power Generation
Bonyic Hyidroelectric Unit is located northeast of Panama Republic in Bocas del Toro Province, near the limits of Panama and Costa Rica, 14 kilometers away from Changuinola´s urban area.
This project is made of a 30 MW Hydroelectric Central, a dam with a 900.000 m3 area of useful capacity...
|
|
View more
|
|
|
|
Coal Silo
Conconcreto built for the company Carbones del Caribe, and as part of the structures needed for coal production, a silo with a 7.500 tons storage capacity, diameter of 72,18 ft and 179,79 ft high.
|
|
View more
|
|
|
|
Argos Columbus Plant
ConConcreto S.A. constructed a cement plant for the company Argos, which produces 1,800,000 tons of cement per year.
Precalcinations tower which measures 140 meters and generated 1000 direct jobs in the building process.
|
|
View more
|
|
|
|
Pilot Tunnel at La Linea
The National Highway Institute, INVIAS, awarded the construction of the Pilot Tunnel or Guidance Tunnel to the partnership CONLINEA, of which Conconcreto S.A. is partner along with CSS Constructores S.A. The tunnel is part of the Bogotá – Buenaventura – Llanos Orientales roadway corridor. This is no...
|
|
View more
|
|
|
|
|
|
Chingaza Rehabilitation
Chingaza system is responsible for 70% of the water consumed in Bogota. Conconcreto has been commissioned several times to maintain and repair this system. It is currently in charge of the construction of the tunnel lining in the Simaya sector and the rehabilitation of the access tunnel to the Diam...
|
|
View more
|
|
|
|
Postobón Plant
ConConcreto S.A. built the production and bottling plant for Postobón S.A., a Colombian company that commercializes non-alcoholic drinks.
|
|
View more
|
|
|
|
Bogota River interceptor
The French-Colombian joint venture partnership Soletanche-Bachy France - Conconcreto S.A., executed, between June 2000 and June 2002, the design and construction project of the Bogota River Interceptor. The project is located in the northwestern area of the Colombian capital, specifically in the sub...
|
|
View more
|
|
|
|
Alpina Administrative Building
Construction of the second phase of the structure and urban planning of Investment Alpes (Alpina) Office Building. Alpina is a company dedicated to the production, marketing and distribution of milk, dairy products and processed foods, with factories in Colombia, Venezuela and Ecuador, and ...
|
|
View more
|
|
|
|
Medellin-Bogota Double-lane Highway Vias de Oriente
ConConcreto S.A. is building the double-lane Highway between the 37th +300 and the 39th +200-kilometer.
These works is being done for Devimed S.A. in order to design, build and set-up and maintain the road developments in the East of Medellin and the Valley of Rionegro and the Puerto Triunfo Conne...
|
|
View more
|
|
|
|
Remodeling of El Dorado Airport
As part of the refurbishing of 7 different airports in Colombia, Conconcreto is responsible for the construction of the structure of the New Cargo Terminal, the structure and finishing of the New Aerocivil Administrative Building and the Quarantined Load Building, within the proposed expansion an...
|
|
View more
|
|
|
|
|
|
10th Street Trans-millennium
The main road will be 7.7 km long and will operate through two rails per way.It will begin in the Calle 31 Sur con Carrera 5 with a Main station that will gather the feeding routes that will serve the locality of San Cristobal. It will also have a parking lot for maintenance and parking.
|
|
View more
|
|
|
|
Porce III Hydroelectric Power Plant
As member of the partnership CCC Porce III, Conconcreto S.A. is taking part in the Project for the construction of conduits, underground powerhouse, dam, and related work for the Porce III Hydroelectric Project. Our involvement in the project takes us back to 2004, year in which we initiated constru...
|
|
View more
|
|
|
|
Enlargement of the Tocumen Airport
The Project consists of the construction of the North Terminal Dock, the new dock, platforms, Access routes, administration building, remodeling of the facade, and building of the presidential chamber and of the airplane gas distribution system for the new aircraft positions.
This Project...
|
|
View more
|
|
|
|
Sonesta Hotel
Located near the Guatapurí Shopping Mall, this hotel will have 106 rooms in a built area of .
View more
|
|
|
|
Unilever National Distribution Center
Unilever is a multinational company that produces dozens of food and personal care brands.
The NDC in Palmira will have a storage capacity of up to 29.000 positions, with a height of 36,09 feet. This distribution center is being built near Unilever´s production plant.
Access road...
|
|
View more
|
|